Ceiling-Wall Corner Hang Kit
$7.00 AUD
Select from the options above to view the appropriate ‘What’s Included’ and ‘Instructions’ below.
Our corner hang kits are designed to suit a range of products by straddling the corners in a room and does not require the need to install into studs.
As low-frequency pressure is highest in the corners, placing treatment here highly improves the low-end performance of all of our absorption products.
Our corner hang kits are designed to suit a range of products by straddling the corners in a room and does not require the need to install into studs.
As low-frequency pressure is highest in the corners, placing treatment here highly improves the low-end performance of all of our absorption products.
8x Screw Cup Hooks
4x Short Chains
4x Nylon Screws
Purchase 1x kit per product.
Please refer to the ‘Room Setup’ guide to determine suitable positioning of your products first.
Always ensure there are no electrical wires behind where you are drilling. Use a AC detecter if unsure.
Tools required: Measuring tape, pencil, electric drill, PH3 Phillips Head, 5mm & 2.5mm drill bit and a level.
- Measure and mark out from the ceiling-wall corner 470mm along the ceiling. Then another 420mm down the wall. Make sure they are in-line.
- Measure 1210mm along the corner, and repeat for the 2 other holes.
There should be four anchor points, two on the ceiling and two on the wall.
Note: the products will hang from chain at each corner of the product at the rear, see picture for details. - Drill a 5mm pilot hole for the four marked out holes into the plaster. If you hit a stud, you can screw the hook directly into it.
- Place the tip of the nylon screw into the hole and screw (PH3) in slowly until flush with the wall. If there is too much resistance, drill a larger pilot hole to avoid breakage.
- Screw the cup hook into the nylon screw and hang on a chain.
- Repeat for all holes.
- On the rear of the product, drill a 2.5mm pilot hole centred on the frame, in each corner. Be very careful not to drill out the side.
- Screw in the four remaining cup hooks into the pilot holes. The hooks should all be pointing inwards.
- Hang the product from the ceiling chains first, then the wall. Use the level to make sure it’s straight.
If you would like someone to install your products for you, please refer to our ‘Services’ page.