Changes to our products - please read this before purchasing!

Wall-Wall Corner Hang Kit

Wall-Wall Corner Hang Kit

Wall-Wall Hang Kit

Wall-Wall Hang Kit

Kit installed

Kit installed

Premium V Panels / Lite Panel for plaster

Premium V Panels / Lite Panel for plaster

Premium V Panel / Lite Panel for masonite

Premium V Panel / Lite Panel for masonite

Ultra V Panels / V Trap / Perf Trap / Binary Diffusers for plaster

Ultra V Panels / V Trap / Perf Trap / Binary Diffusers for plaster

Ultra V Panels / V Trap / Perf Trap / Binary Diffusers for masonite

Ultra V Panels / V Trap / Perf Trap / Binary Diffusers for masonite

Wall-Wall Corner Hang Kit

$7.00 AUD


Select from the options above to view the appropriate ‘What’s Included’ and ‘Instructions’ below.

Our corner hang kits are designed to suit a range of products by straddling the corners in a room and does not require the need to install into studs.

As low-frequency pressure is highest in the corners, placing treatment here highly improves the low-end performance of all of our absorption products.

4x Screw Cup Hooks
2x Chains
2x Nylon Screws



Purchase 1x kit per product.

Please refer to the ‘Room Setup’ guide to determine suitable positioning of your products first.
Always ensure there are no electrical wires behind where you are drilling. Use a AC detecter if unsure.

Tools required: Measuring tape, pencil, electric drill, PH3 Phillips Head, 5mm & 1mm drill bit, a level and a second person to assist. 

  1. Measure and mark out from the corner, two holes at 375mm along each wall, both at the same height.
Recommended heights from floor to drilling points are: 

    - 1730mm for low ceilings from 2.4-3m &

    - 2030mm for high ceilings at 3m and above.

    These heights also match our ‘Stands’ range.

    Note: the products will hang from chain on the top edge of the top support bar at the rear, see picture for details.

  2. Drill a 5mm pilot hole for the two marked out holes into the plaster. If you hit a stud, you can screw the hook directly into it.

  3. Place the tip of the nylon screw into the hole and screw (PH3) in slowly until flush with the wall. 
    
If there is too much resistance, drill a larger pilot hole to avoid breakage.

  4. Screw the cup hook into the nylon screw and hang on a chain.

  5. Repeat for second hole.

  6. On the top edge of the top rear support bar, measure in 30mm from one side and drill a 1mm pilot hole. Repeat for opposite end.

  7. Screw in the two remaining cup hooks into the pilot holes. The hooks should be pointing up towards the ceiling.

  8. Hang the product from the chains to the hooks. Use the level to make sure it’s straight.

If you would like someone to install your products for you, please refer to our ‘Services’ page.

Not for you?